Biodiversity Net Gain Services
Coordinated BNG support from site appraisal to long-term delivery
Biodiversity Net Gain can affect site selection, development layout, landscape design, planning documentation and long-term land management.
Croft Ecology provides practical BNG support throughout the development process. We can undertake individual assessments where the required scope is already clear, or provide a coordinated package from the initial habitat survey through to planning approval, implementation and monitoring.
Our advice is tailored to the site, the proposed development and the stage the project has reached.
Our BNG services
Early-stage feasibility and due diligence
Considering BNG before a site is acquired or a development layout is fixed can reveal important constraints and opportunities.
We can review available plans, mapping and ecological information to provide an initial indication of:
the habitats likely to be present;
areas that may be difficult or costly to replace;
the potential implications for developable area;
whether the required gain appears achievable on-site;
the likely need for off-site biodiversity units; and
the further surveys and assessments that may be required.
Early feasibility work cannot replace a detailed habitat survey, but it can support more informed decisions before substantial design or acquisition costs are incurred.
Habitat surveys and baseline assessment
A reliable BNG calculation depends on an accurate understanding of the habitats present before development.
We undertake habitat surveys using the UK Habitat Classification system and assess habitat condition in accordance with the applicable statutory biodiversity metric guidance.
The survey establishes the pre-development baseline, including the type, extent, distinctiveness and condition of habitats within the site. Depending on the project, this may include:
area habitats;
hedgerows and lines of trees;
watercourses;
individual trees;
ponds;
grassland;
scrub;
woodland; and
urban and developed habitats.
The baseline survey may be undertaken alongside a Preliminary Ecological Appraisal where wider ecological constraints also need to be assessed.
Biodiversity metric calculations
We prepare statutory biodiversity metric calculations to quantify the effect of development proposals and the gains provided through habitat creation and enhancement.
The calculation compares the pre-development habitat baseline with the proposed post-development habitats, taking account of factors including:
habitat type and distinctiveness;
habitat condition;
strategic significance;
time required to create or enhance habitat;
the difficulty of achieving the proposed habitat;
spatial risk; and
the location of on-site and off-site measures.
Metric calculations should be treated as an iterative design tool rather than simply a final planning document. Testing different layouts and habitat proposals can help identify more efficient and deliverable solutions.
We provide the completed metric together with plans, supporting information and an explanation of the principal assumptions.
More BNG planning services
-
The way a site is designed can significantly affect the scale and cost of its BNG requirements.
We work with architects, planners, landscape professionals and engineers to identify opportunities to:
retain valuable existing habitats;
avoid unnecessary habitat losses;
integrate habitat creation into the development;
improve the condition of retained habitats;
coordinate ecological measures with drainage and landscaping;
provide suitable buffers and habitat connections; and
reduce reliance on off-site biodiversity units.
Early collaboration is particularly important where a site contains habitats that are difficult to replace or where the amount of land available for biodiversity enhancement is limited.
Our role is not simply to increase the metric score. Proposed habitats must also be appropriate for the site and compatible with its future use.
-
Where possible, biodiversity gains may be delivered within the development site.
We can advise on the combination of habitat retention, enhancement and creation needed to meet the project’s objectives.
This may include measures such as:
species-rich grassland;
native scrub and woodland planting;
hedgerow creation and enhancement;
pond and wetland habitats;
sustainable drainage features designed for biodiversity;
orchard creation;
tree planting; and
improvements to existing habitats.
On-site habitat proposals must be realistic within the context of the development. Public access, amenity use, shading, drainage, soil conditions, maintenance requirements and future ownership can all affect whether a habitat is likely to succeed.
We therefore assess not only whether a habitat generates sufficient biodiversity units, but also whether it can be established and maintained over the long term.
-
Some developments cannot achieve the required BNG entirely within the site boundary.
Where an off-site solution is needed, we can quantify the shortfall and identify the type and number of biodiversity units required.
This allows the client to approach registered habitat-bank providers or other suitable landowners with a clearly defined requirement. We can also review proposed off-site units to confirm whether they correspond with the development’s habitat losses and satisfy the applicable metric rules.
Where a client controls additional land, we can assess whether that land may provide an appropriate off-site solution and advise on the ecological, planning and management implications.
Statutory biodiversity credits generally represent a last-resort option where suitable on-site and registered off-site solutions are not available.
-
A Biodiversity Gain Plan sets out how the development will meet its BNG obligations.
It typically draws together information from the habitat survey, biodiversity metric, development plans and habitat management proposals.
Depending on the project and planning route, it may include:
the pre-development biodiversity value;
the proposed impact on existing habitats;
the application of the biodiversity gain hierarchy;
the proposed on-site gains;
any off-site biodiversity units;
the completed statutory biodiversity metric;
plans identifying retained, enhanced and created habitats; and
arrangements for securing and managing the gain.
We prepare Biodiversity Gain Plans that are consistent with the wider planning submission and clearly explain how the BNG requirement will be delivered.
-
Where habitats are being created or enhanced for BNG, a Habitat Management and Monitoring Plan is commonly required.
The plan explains how the habitats will be established, managed and monitored over the agreed period, which is generally at least 30 years.
An HMMP may include:
habitat objectives;
establishment works;
annual and seasonal management prescriptions;
responsibilities for delivery and oversight;
monitoring methods and frequency;
habitat condition targets;
reporting arrangements;
remedial measures; and
procedures for adapting management where habitats are not developing as intended.
The management proposals must be sufficiently detailed to demonstrate that the target habitats are achievable, while allowing appropriate flexibility to respond to changing site conditions.
We prepare standalone HMMPs and can also work alongside landscape architects, management companies and other specialists where responsibilities are divided across the project team.
-
Some on-site habitat enhancements may need to be secured and maintained for at least 30 years, even where the overall BNG requirement is achieved without purchasing off-site units.
We can help identify which proposed habitats may constitute significant on-site enhancements and advise on:
appropriate management objectives;
monitoring and reporting;
responsibilities for long-term delivery;
consistency with planning conditions and legal agreements; and
practical arrangements for future site owners or management bodies.
These requirements should be identified before management and ownership arrangements are finalised.
-
BNG requirements may be addressed through pre-commencement conditions, Biodiversity Gain Plans, landscape conditions, ecological management plans or legal agreements.
We can review planning decisions and consultee comments to identify what information is required and prepare the necessary ecological documents for condition discharge.
This may involve:
updating the biodiversity metric;
revising habitat plans;
preparing or updating an HMMP;
responding to local planning authority comments;
reconciling differences between approved plans and the metric;
clarifying on-site and off-site commitments; and
providing implementation notes for contractors and site managers.
Where conditions have been drafted ambiguously or overlap with other ecological requirements, we can help the project team identify a coherent and proportionate response.
-
The habitats shown within a BNG calculation must ultimately be delivered on the ground.
We can provide ecological input during the implementation stage, including:
review of detailed landscape proposals;
advice on habitat specifications;
pre-start meetings;
contractor briefings;
site inspections;
review of planting and seeding proposals;
advice on soil preparation and establishment; and
confirmation of whether completed works reflect the approved strategy.
Early implementation oversight can help identify problems before habitats fail or become costly to rectify.
-
BNG habitats may require monitoring at specified intervals throughout the management period.
We can undertake habitat condition monitoring, assess progress against agreed targets and prepare reports for the responsible body, local planning authority or other stakeholders.
Monitoring may include:
habitat condition assessments;
fixed-point photography;
review of management records;
assessment against metric condition criteria;
identification of establishment or management failures;
recommendations for remedial action; and
updates to the management approach where necessary.
Monitoring should provide meaningful evidence that the agreed biodiversity outcomes are being achieved, rather than simply recording whether routine maintenance has taken place.
A typical BNG process
Although each project is different, BNG work will commonly follow these stages.
Croft Ecology can support the full process or become involved at a specific stage where specialist input is required.
1. Establish the habitat baseline
Survey the site, classify the habitats and assess their condition.
2. Review the development proposals
Identify the habitats that will be retained, lost, enhanced or created.
3. Calculate the initial BNG position
Use the statutory biodiversity metric to identify the likely gain or shortfall.
4. Refine the design
Test layout changes, habitat proposals and management options to develop a more efficient and deliverable solution.
5. Agree the delivery strategy
Survey the site, classify the habitats and assess their condition.
6. Prepare the planning documents
Complete the metric, plans, Biodiversity Gain Plan, HMMP and any other supporting information.
7. Secure and implement the habitats
Put the appropriate planning, legal, ownership and management arrangements in place.
8. Monitor long-term delivery
Assess whether habitats are progressing towards their agreed targets and take remedial action where required.
Coordinating the BNG documents
A BNG submission may involve several related documents, but these should not be prepared in isolation. The habitat areas and descriptions shown in the biodiversity metric must correspond with the development layout, landscape plans and habitat plans. The Biodiversity Gain Plan must accurately describe the delivery strategy, while the HMMP must provide a realistic method for achieving and maintaining the proposed habitat conditions.
Inconsistencies between these documents are a common source of delay, particularly where the metric has been updated without corresponding changes to the drawings or management proposals. We review the complete BNG package to help ensure that the documents are technically consistent and capable of being implemented.
When should BNG work begin?
The best time to consider BNG is usually before the development layout is substantially fixed. At this stage, the project team may still be able to retain higher-value habitats, adjust access or drainage proposals, allocate sufficient land for habitat creation and avoid unnecessary reliance on purchased biodiversity units.
Where a project is already further advanced, we can review the current proposals and identify the most practical route forward. However, late changes can affect layout, viability, landscaping and the timetable for submitting or determining the application. For land acquisition or development appraisal, an initial BNG feasibility review can help identify potential liabilities before significant commitments are made.